1Your build
2Register
3Your matches
Colocation
Space and power. The rest we can talk about.
Colocation comes down to the details, so the four that size a cabinet are required. Everything else is optional here, and your specialist picks it up from what you write.
How much space?
Power per cabinet?Not sure? Pick the closest. Power is the number that prices a cabinet, so we would rather have your best guess than a blank. If you already know your circuit spec (voltage, amps, AC or DC), drop it in the notes below and it travels with your request word for word.
Where should it live?A metro is plenty. It decides which data centers we can reach out to.
When?
Anything we should know up front?optionalGoes word for word to the Tricore specialist working your build.
Your facility matches are computed right here. Registration is the only thing between you and them.